Ensuring a coordinated system operation and sound technical evolution

​​​​​Network codes and guidelines are binding rules governing connection requirements to the electricity networks in an effective and transparent manner. They were established in 2009 by the EU Regulation on conditions for access to the network for cross-border exchanges in electricity  and recast in 2019 by the Regulation on the internal market for electricity .

The codes are crucial for ensuring the safety of system operation and the efficiency of the European Union's power grid. ​​

Grid Connection Codes

​​Grid connection refers to all the subjects establishing and maintaining a physical connection between the transmission and/or distribution grids and the grid users.  

Grid connection, or network connection, is one of the areas regulated by the specific network codes. These rules aim to develop a harmonised electricity grid connection regime, as well as efficient and secure operations. This is particularly important in view of the integration of an increasing share of sources of renewable energy in the system. European rules on grid connection also ensure a fair competition in the electricity market, and facilitate the electricity trade across the Union.

Three network codes on grid connection have been developed:

  • The network code on requirements for grid connection of generators (RfG Regulation) establishes common standards that generators must respect to connect to the grid.

  • The network code on demand connection (DCC Regulation) sets up harmonised requirements that demand facilities must respect to connect to the grid. 

  • The network code on requirements for grid connection of high voltage direct current systems (HVDC Regulation) covers the definition of harmonised standards for direct current (DC) connections.​​​

 

 

Building trans-European energy infrastructure: ACER finds that more than half of the projects are on time, but observes several delays and some potentially non-robust Projects of Common Interest (PCIs)https://extranet.acer.europa.eu/Media/News/Pages/Building-trans-European-energy-infrastructure.aspx10/06/2021 23:00:00Building trans-European energy infrastructure: ACER finds that more than half of the projects are on time, but observes several delays and some potentially non-robust Projects of Common Interest (PCIs)
ACER decides on a common methodology for splitting long-term cross-zonal electricity capacity in three Member Stateshttps://extranet.acer.europa.eu/Media/News/Pages/ACER-decides-on-a-common-methodology-for-splitting-long-term-cross-zonal-electricity-capacity-in-three-Member-States.aspx04/12/2020 00:00:00ACER decides on a common methodology for splitting long-term cross-zonal electricity capacity in three Member States
Regulators welcome the Commission’s Trans-European Networks for Energy (TEN-E) proposals but see scope for further improvement for energy network developmenthttps://extranet.acer.europa.eu/Media/News/Pages/Regulators-welcome-the-Commission’s-Trans-European-Networks-for-Energy-(TEN-E)-proposals-but-see-scope-for-further-improvem.aspx16/12/2020 00:00:00Regulators welcome the Commission’s Trans-European Networks for Energy (TEN-E) proposals but see scope for further improvement for energy network development