South South-East Gas Regional Initiatives

LinkedIn LinkedIn Copy Link Copy Link

Members

​​​The South South-East (SSE) region includes 20 countries: 12 EU Member States, plus 8 Energy Community Contracting Parties.

The South South-East Gas Regional Initiative is composed of:

  • Austria

  • Bulgaria

  • Croatia

  • Cyprus

  • Czech Republic

  • Greece

  • Hungary

  • Italy

  • Poland

  • Romania

  • Slovakia

  • Slovenia

Participating Energy Community Contracting Parties:

  • Albania

  • Bosnia and Herzegovina

  • Kosovo

  • Former Yugoslav Republic of Macedonia

  • Moldova

  • Montenegro

  • Serbia

  • Ukraine

The region is co-chaired by AERS and ERU (respectively the Serbian and Czech energy regulator).


The participation of the Energy Community in the GRI SSE is the result of an intensified cooperation started in 2014. Since then, the Energy Community Secretariat has joined the meetings together with the Contracting Parties.​​

 

 

ACER and CEER recommend when and how to regulate pure hydrogen networkshttps://extranet.acer.europa.eu/Media/News/Pages/ACER-and-CEER-recommend-when-and-how-to-regulate-pure-hydrogen-networks.aspx09/02/2021 00:00:00ACER and CEER recommend when and how to regulate pure hydrogen networks
Building trans-European energy infrastructure: ACER finds that more than half of the projects are on time, but observes several delays and some potentially non-robust Projects of Common Interest (PCIs)https://extranet.acer.europa.eu/Media/News/Pages/Building-trans-European-energy-infrastructure.aspx10/06/2021 23:00:00Building trans-European energy infrastructure: ACER finds that more than half of the projects are on time, but observes several delays and some potentially non-robust Projects of Common Interest (PCIs)
ACER finds serious shortcomings in ENTSOG's gas network plans – underlining the need for current TEN-E reforms to strengthen independent project assessmentshttps://extranet.acer.europa.eu/Media/News/Pages/ACER-finds-serious-shortcomings-in-ENTSOs’-energy-network-plans.aspx03/05/2021 23:00:00ACER finds serious shortcomings in ENTSOG's gas network plans – underlining the need for current TEN-E reforms to strengthen independent project assessments